First 100 Registrations have been opened for vndors
Inverter Checkup Includes
> On Site Visit
>Load Test
>Backup Time Test
> Settings and Functions
> Feed In Grid Test (If Required)
>Inverter Wire Connections Check
> Terminal Connections | Loose / Tight (Check + Fix)